Bridge Update (8/23/2021

In a meeting on Monday, August 23 2021, with Atlantic County and Construction Officials, the following information was shared:

1) The waterway will be closed to boat traffic under the bridge from Riverside Drive side to about 2/3 of the way across the bridge from September 7th to September 21st.

2) During that time, a second shift will be working from September 7th for about a week to continue demolishing the span. They are aware of the City’s noise Ordinance. They don’t expect the noise to be excessive.

3) From September 21st to October 7th boat traffic can go through the bridge before and after work hours (7:00 am-3:30 pm). After that, the waterway will be open again.

4) During all of this, there will be bright orange floating barriers highlighting the closed areas.